Mobile Crane Operator & Slinger Assessment

Master Question Bank — 20 Single Choice + 9 Open Questions

Part A — Single Choice

Q1. When setting up a mobile crane, what should be considered?
Correct answer: B
Q2. What should you check on the stabiliser leg spreader pads prior to lifting?
Correct answer: A
Q3. At what wind speed should crane operations be stopped?
Correct answer: A
Q4. When determining an uneven load's mass, you should:
Correct answer: A
Q5. A crack in the windshield of a crane cab is OK so long as:
Correct answer: A
Q6. What effect would waterlogged material, such as sand, blocks or timber, have if they make up the load to be lifted?
Correct answer: C
Q7. What is meant by the term 'centre of gravity' when talking about the load?
Correct answer: A
Q8. During a lift and in normal circumstances when is it acceptable for the crane operator to dismount the crane?
Correct answer: C
Q9. Ropes, slings and chains must be tested.
Correct answer: B
Q10. Weight is constant. True or false?
Correct answer: B
Q11. What is the hand signal to raise the boom of a mobile crane?
Correct answer: D
Q12. Ropes, slings and chains must be tested.
Correct answer: B
Q13. Weight is constant. True or false?
Correct answer: B
Q14. In conditions where the wind speed will exceed the specifications of the lifting plan or crane specification what action should the crane operator take?
Correct answer: C
Q15. Adherence to Load plans is solely the responsibility of the Appointed Person.
Correct answer: B
Q16. Which of the following is the correct definition for mass?
Correct answer: B
Q17. What precautions must the crane operator take regarding lifting area security?
Correct answer: C
Q18. Where should the hook be positioned in relation to the load?
Correct answer: B
Q19. When using a specifically designed personnel carrier what precautions must the crane operator take?
Correct answer: D
Q20. Ideally, how should slings and lifting accessories be stored?
Correct answer: B

Part B — Open Questions

Open Q1. List 2 precautions that as an operator, you should take before a slinger starts attaching or disconnecting their slings when working?
Suggested assessor answer: Stop/secure the crane and keep the hook/load under control; ensure clear communication and prevent unexpected crane movement.
Open Q2. Name 4 different types of lifting accessory
Suggested assessor answer: Wire-rope slings; web/round slings; chain slings; shackles.
Open Q3. Name 8 essential items listed on a lifting plan
Suggested assessor answer: Load weight; load dimensions/centre of gravity; lifting points; crane type/capacity; crane position and radius; ground/outrigger conditions; lifting route/exclusion zone; hazards/clearances and communications.
Open Q4. The siting of the Mobile Crane should take account of many safety factors that might affect its safe operation (name 4)?
Suggested assessor answer: Ground bearing/stability; overhead power lines/obstructions; excavations or underground services; access, clearances and other site obstructions.
Open Q5. Name 2 effects on the load when a crane operator slews too quickly.
Suggested assessor answer: Load swing; excessive dynamic/side-loading forces.
Open Q6. State the action that the operator must take if they have not accurately understood the instructions given by a slinger.
Suggested assessor answer: Stop the operation and obtain clarification before continuing.
Open Q7. When is it acceptable to override a mobile crane's Rated Capacity Indicator (RCI) and when must it NEVER be overridden?
Suggested assessor answer: Only when specifically permitted by the manufacturer/approved procedure for a controlled function; never to bypass protection or exceed rated capacity/safe limits.
Open Q8. Name 2 types of communication systems that can be used when working with slingers?
Suggested assessor answer: Hand signals and radio communication.
Open Q9. Describe gross and net weight.
Suggested assessor answer: Gross weight is the total weight including packaging/container. Net weight is the weight of the load/content excluding packaging/container.